Part 2: Demolition

I am sure that a lot of heavy work went 
into this demolition!
It took them a good part of the
first week to take down the fixtures
and walls plus haul the
rubble to the dump.

Raw wall where the tub used to be.
They completely took out that wall between
the tub and toilet.

Stripping the wall from behind the pink vanity.

This tub was too heavy for the guys to haul in
one piece, so they spent lots of time
and muscle cracking it in half.
Dump weight in: 800lbs.

Taking down the dry walls and tiling.
I am so impressed with all the work they did!
I can only imagine how sore they were.
(and this was only week one!)
They certainly deserved all the junk food
and yuengling they consumed. :)

~Michelle