I am sure that a lot of heavy work went
into this demolition!
It took them a good part of the
first week to take down the fixtures
and walls plus haul the
rubble to the dump.
![]() |
Raw wall where the tub used to be. They completely took out that wall between the tub and toilet. |
![]() |
Stripping the wall from behind the pink vanity. |
![]() |
This tub was too heavy for the guys to haul in one piece, so they spent lots of time and muscle cracking it in half. Dump weight in: 800lbs. |
![]() | |
Taking down the dry walls and tiling. |
I am so impressed with all the work they did!
I can only imagine how sore they were.
(and this was only week one!)
I can only imagine how sore they were.
(and this was only week one!)
They certainly deserved all the junk food
and yuengling they consumed. :)
and yuengling they consumed. :)
~Michelle